KEY OPERATIONS
- Low-rise Buildings
- High-rise Buildings
- Residential, Commercial & Industrial
CLIENT GOALS MET for all projects undertaken
IBS COMPONENTS OPTIMIZED in all our constructions
MILLIONS SAVED through value engineering, an integral component of the Qube System
Big enough to handle complexity,
small enough to move with agility
We are able to handle contracts of any size and complexity on the strength of our track record and competencies. Our agile project teams respond swiftly to construction variables – implementing value-creation and efficiency at various stages of construction through our Qube System of optimization.
Kuala Lumpur Sports City (Formerly Bukit Jalil National Sports Complex)
The challenge
To complete refurbishment works for a national icon in time for the KL SEA Games 2017.
Our solution
Strong operational integration, right coordination between site work units and relevant authorities, and round-the-clock construction were deployed to meet quality, time and cost requirements.
D'Pristine @ Medini Iskandar, Johor
The challenge
Managing project cost fluctuations due to volatile raw material prices within construction period.
Our solution
Our engineers developed a compact piling system with higher load-bearing capacity requiring less materials overall, significantly reducing cost and time.
MSM Sugar Refinery Warehouse, Johor
The challenge
Achieving time and cost objectives for the construction of a warehouse facility for Malaysia’s biggest sugar refinery.
Our solution
Integrated construction services and resources to deliver structural, technical and safety requirements on time and within budget.
Setia Sky Seputeh, Kuala Lumpur
The challenge
To meet demanding construction targets for two luxury 37-storey towers.
Our solution
Improving upon past high-rise construction modes and technologies to reduce inefficiencies. Optimizing Industrialized Building Systems for solid construction and shorter construction times.